SPARE PARTS

We got a box full of spare parts for the building.   What's inside?

SAM_1372.JPG

Replacement fire sprinkler heads.  The glass centre varies for different temperatures.  The red glass breaks at 155 degrees Fahrenheit  and opens the water line.

SAM_1371.JPG

Three coats of mud on the front foyer feature wall, and now it's getting a final sanding.

SAM_1369.JPG

Steel studs are are getting installed in the front foyer, coffee area and kitchen.  With 7 drywaller's working, this area will change quickly.

SAM_1373.JPG
SAM_1375.JPG
SAM_1374.JPG