WORKING OFF OF LIFTS

The electricians are installing conduit in the front foyer and the coffee room.

SAM_1294 (2).JPG
SAM_1284 (2).JPG

The steel studs are being installed above the front entrance.

SAM_1293 (2).JPG

Brian Ferreira got a tour of the building.  Contact Ralph if you're interested in seeing the building for yourself.

SAM_1291 (2).JPG