S & J Construction are bringing in gravel for the main floor infill.

SAM_0605.JPG

Compacting the gravel in the daycare and kitchen areas.

SAM_0606.JPG

Elbar Erectors are laying down the second floor steel decking.  At the far end of the pictures you can see the two steel openings showing the size of the future windows in the Boom Youth room.

SAM_0608.JPG
SAM_0607.JPG