Grade Beams Poured

It took 5 hours to pour the 10" wide x 24" tall concrete beams. 

The bolts on top of the concrete are used to fasten the future steel columns.

SAM_0273.JPG

Vertical rebar is used to set the masonry surrounding the gym.

The horizontal rebar is for the concrete pad on the outside of the building.