WALLS ARE STARTING TO GO UP

A new job-site shack is being set in place.

SAM_0781.JPG

Mapleleaf Construction is laying the base gravel in the parking lot area. 

SAM_0745.JPG

A few of the hollow metal door frames have arrived.

SAM_0776.JPG

Cunha Masonry has started laying the 8' high concrete blocks for the walls surrounding the sanctuary/gym area. 

SAM_0774.JPG
SAM_0760.JPG
SAM_0763.JPG

Mapleleaf Construction has setup a horizontal boring machine on the other side of Chevrier to connect the sewer line.  They're digging under the road.

SAM_0747.JPG

Checking to see if the hole is deep enough! 

SAM_0751.JPG

S & J Construction are laying down the VoidForm and rebar at the entrance door concrete pads.

SAM_0780.JPG